Preliminary Site Work 3/31/84

Welding the Fence
A Bobcat
Repairing the Fountain
Laying Tile
Chet Chappell
Sorting Tile
Kathi Nelson sweeps the slab
Fixing cracks in the slab
I visit Billie Evans

The Pre-build Safety Meeting

Don Jackson, Dave Nichols and...
Bob Acosta

The 2-day Quick Build: Saturday

7:01am Cameraman
7:07am 1st beams and posts
7:14am 1st wall up
7:19am North wall up
7:24am The Peanut Gallery
7:35am NE Corner Top Plate
7:43 East Wall Fitted
7:48 Cutting Gutters on Sod
8:00 Kids on the Sand Pile
8:20am Joe Bahris Paints Signs
10:19am Trusses Half On

Building a Kingdom Hall in two days - Oakland CA 1984

First Day, Saturday March 31st - Cutting gutters and fitting sheet metal 7:48 am

Two day Kingdom Hall quick build. Kids on the sand pile 8:00 am

Sand was piled up in preparation for making stucco.

The young children discovered that it was an ideal play area.

At 8am exactly the announcement came over the loudspeakers that it was time to stop work and consider the Daily Text. All tools were put down as the Bible text for the day was discussed.