Preliminary Site Work 3/31/84

Welding the Fence
A Bobcat
Repairing the Fountain
Laying Tile
Chet Chappell
Sorting Tile
Kathi Nelson sweeps the slab
Fixing cracks in the slab
I visit Billie Evans

The Pre-build Safety Meeting

Don Jackson, Dave Nichols and...
Bob Acosta

The 2-day Quick Build: Saturday

7:01am Cameraman
7:07am 1st beams and posts
7:14am 1st wall up
7:19am North wall up
7:24am The Peanut Gallery
7:35am NE Corner Top Plate
7:43 East Wall Fitted
7:48 Cutting Gutters on Sod
8:00 Kids on the Sand Pile
8:20am Joe Bahris Paints Signs
10:19am Trusses Half On

Building a Kingdom Hall in two days - Oakland CA 1984

Preliminary Site Work - repairing the interior lobby fountain

Two day Kingdom Hall quick build. Repairing the interior lobby fountain before construction

Before the actual 2-day construction began, there was extensive preliminary site work.

The inside lobby fountain developed some cracks which required some additional grouting work. The brother had to stand on the fountain stones to do the repairs.

Anyone recognize the brother doing the repair?